EDC gets ERC nod for M3 plant connection to Mindanao Grid
- May 23, 2022
The Energy Regulatory Commission (ERC) has approved Lopez-led Energy Development Corporation’s (EDC) application to establish a point-to-point transmission line to connect the 3.6-megawatt (MW) Mindanao 3 (M3) binary geothermal power plant to