MVIP stabilizes power supply amid March demand peaks
- March 27, 2024
The Mindanao-Visayas Interconnection Project (MVIP) facilitated the export of excess power of up to 450 MW from the Mindanao grid, contributing to an average export of 341 MW to Visayas. This played