Bohol reconnected to grid after partial restoration of Ormoc-Maasin line
- April 18, 2022
Power transmission services in Bohol have resumed after the National Grid Corporation of the Philippines (NGCP) restored and energized the 138-kilovolt (kV) Ormoc-Maasin line 2 in Leyte on Easter Sunday evening. The