One Bohol, EDC sign 10-year supply deal
- July 4, 2022
Bohol will soon have a backup source of power should it be disconnected from the grid after signing a 10-year power supply deal with the Energy Development Corporation (EDC). The power supply
Bohol will soon have a backup source of power should it be disconnected from the grid after signing a 10-year power supply deal with the Energy Development Corporation (EDC). The power supply
The Energy Development Corporation (EDC) will ink a five-year power supply agreement with Razon-led MORE Electric Power Corporation (MORE) for 20 megawatts (MW) worth of renewable mid-merit supply. The RE supply will
Lopez-led Energy Development Corporation (EDC) has signed a power supply agreement (PSA) with TDK Philippines Corporation as part of the manufacturing company’s climate change efforts. First Gen Corporation’s renewable energy arm will
The Department of Energy (DOE) has endorsed 28 new projects to the National Grid Corporation of the Philippines (NGCP) to undergo system impact studies (SIS) in April and May. An SIS is
The Energy Regulatory Commission (ERC) has approved Lopez-led Energy Development Corporation’s (EDC) application to establish a point-to-point transmission line to connect the 3.6-megawatt (MW) Mindanao 3 (M3) binary geothermal power plant to
Lopez-led First Gen Corporation has allotted a capital expenditure (capex) of $550 million (around Php29 billion for this year, with a bulk going to the expansion projects to its renewable energy (RE)
Lopez-led First Gen Corporation recorded a recurring net income of Php3 billion ($59 million) in the first quarter of 2022, a 25.1% decline from the Php3.8 billion ($78 million) posted in the
Lopez-led Energy Development Corporation’s (EDC) net income for the first quarter of the year dipped by 19% to Php2.63 billion versus the Php3.26 billion recorded in the same period in 2021. “The
Citicore Energy Solutions Inc. (CESI), the retail arm of Citicore Renewable Energy Corporation (CREC), has renewed five of its power supply contracts with its clients that are all expiring this year. The
Lopez-led Energy Development Corporation (EDC) has formally launched the operations of its 3.6-megawatt (MW) Mindanao 3 (M3) binary geothermal power plant in Kidapawan City, North Cotabato. The new plant, an extension of