DOE endorses 11 RE projects to NGCP for SIS
- April 22, 2024
The Department of Energy (DOE) has endorsed 11 power projects to the National Grid Corporation of the Philippines (NGCP) for a system impact study (SIS) in March 2024. The array of projects,
The Department of Energy (DOE) has endorsed 11 power projects to the National Grid Corporation of the Philippines (NGCP) for a system impact study (SIS) in March 2024. The array of projects,
The Department of Energy (DOE) is expecting improvements over the weekend amidst continuous power outages, as well as implementations of red and yellow alerts, as some power plants are back online. In
Following the Yellow and Red alerts declared by the National Grid Corporation of the Philippines (NGCP), the Department of Energy (DOE) through its Electric Power Industry Management Bureau (EPIMB) is diligently watching
The Department of Energy (DOE) inaugurated its Mobile Energy System (MES) and Energy Sector Emergency Operations Center (ESEOC), two strategies made to confront the necessity for resilient energy infrastructure. In a statement,
Recertifying energy efficiency (EE) practitioners, according to the Philippine Energy Efficiency Alliance, Inc. (PE2), will help them fulfill their duties under Republic Act (RA) No. 11285 or the Energy Efficiency and Conservation
President Ferdinand Marcos Jr. is pushing the National Grid Corporation of the Philippines (NGCP) to finish its energy expansion initiatives within the designated timeframe. In the ceremonial energization of the Cebu-Negros-Panay (CNP)
The Department of Energy (DOE) shares that the country is 53 gigawatts (GW) way in reaching its 2040 renewable energy (RE) capacity target. Energy Assistant Secretary Mylene C. Capongcol said that the
The Department of Energy (DOE) is seeking the opinions of stakeholders on its plan to implement a Causer Pays Mechanism (CPM). In a report by the Philippine Star, the DOE said that
Senator Sherwin “Win” Gatchalian has prompted the Department of Energy (DOE) to immediately respond to the looming yellow alert within the Luzon grid area, amidst concerns over the prevailing El Niño conditions.
The Department of Energy (DOE), together with the Department of Science and Technology (DOST), have signed a Memorandum of Agreement (MOA), which aims to join forces in the advancement of renewable energy